Forum discussion

Retail-NC-v4 EQp1:Minimum indoor air quality performance

Project located in a building with a very low fresh air rate

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change to building systems, what option are available to meet this prerequiste,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 01/17/2017 - 21:15

Renovation! I don't think you can meet the prereq without doing something to directly improve the system.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.