A Contradiction? (my project is under LEED NC 2009) The LEED 2009 ref. guide is unclear with the inclusions for Div. 31, and 32. Are base, subbase, subgrade preparations; stone, aggregate and topsoil included in the material costs for Divisions 32 1000 and 32 3000-Asphalt/Concrete Paving and Plantings/Turf? Or do material costs only include asphalt/concrete mixes, associated Joint sealants, asphalt paints, and turf seed, fertilizers? It merely states. "include these Divisions (also 31 6000) in material costs". The incongruity: our Specification for Asphalt/concrete paving calls "Earth Moving" for subgrade preparation a related requirement under Div. 31 2000 (not an included Div. as stated in Ref. guide) Conversely, the CSI classifications group Bases-base courses within Div. 32 1000 (an included Div. for const. materials) If helpful, CSI classifications available here: http://web.stanford.edu/group/narratives/classes/08-09/CEE215/ReferenceLibrary/Construction%20Specification%20Institute%20(CSI)/CSI_MASTERFORMAT/MF2004ETM-Oct2005.xls Can anyone offer insight or direction? Thank you
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.