NC-2009 MPR2:Must be a complete, permanent building or space

LEED V4 DATA CENTER

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box. Can I still make 1 certification for each building? Thanks,

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 12/08/2014 - 18:21

Caroline, how about things like the name of the facility, the HVAC systems, plumbing systems, etc — are they shared or separate?If it is as simple as you said, and they just share a corridor (which I assume has a fire door) and one electrical box, they can probably have separate certifications.Regarding that electrical box, I would look closely at the LEED v4 credits and prerequisites around energy metering, and make sure that the new facility will have the metering capability needed to comply.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.