Forum discussion

CI-2009 EAc3:Measurement and Verification

MPR 6

I have tried to figure out but cannot wrap my head around another subject. MPR 6 requires sharing actual whole-project energy and water usage data for a period of at least 5 years. This means that unless it is cost-prohibitive or physically impractical you should have meters for your project space. So, if you only need to measure consumption by energy type to earn this credit (

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 09/13/2013 - 21:00

This becomes bonus points.

Fri, 01/24/2014 - 19:28

Is the one point (for complying with MPR #6) available to CI projects?

Fri, 01/24/2014 - 19:51

I do not see that option within this credit. Since it is available in BD+C projects I am not sure what possible reason there could be for excluding it from ID+C projects. Perhaps it is an oversight? I would argue that it should be an option.

Sat, 03/08/2014 - 04:06

I think it was intentionally excluded by USGBC, but I don't know the reasoning. I think contacting them to clarify, and/or requesting a CIR, would be a great way to force the issue.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.