I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar. As per reference guide sizing guideline, do I have to provide two individual centralized locations (275 SF minimum each) to meet credit intent, or can I provide one (500 SF) room to meet the prerequisite requirement for both projects?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 11/04/2013 - 00:20

Jesus, the first FAQ above relates to this. The collection point for recycling does not have to be within your LEED project boundary, as long as it is an accessible and sensible location for the project. And, the sizing recommendations are just recommendations—again, see the FAQs. So I would make the right choice for the buildings first, and then explain it in a LEED narrative.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.