We are adding an addition to an existing facility. Ideally the performance period for energy would start after construction is complete. Is it acceptable to start the performance period for MRc3 and other construction type credits like EQc1.5 before recording energy star performance? All credits would then complete the performance period within a 30 day window. I realize the maximum limit for the performance period is 2 years. Thanks!