We are working on a municipal water processing plant. A huge amount of water courses through the plant, while only a tiny fraction is used by the plumbing fixtures, and similarly, a process energy exceeds building systems energy by perhaps 1000:1. GBCI has indicated that we do not need to add meters to separate these loads. The only utility meters are for the whole site ; multiple industrial facilities. So, when we are filling out MRP6, which of the 3 reporting options do we choose, and how will the facility report, or would they not report?
Under these circumstances, is the 1 point for reporting in EAc5 possible to get?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
March 21, 2013 - 2:26 pm
Susan, I would assume that the facility would not report, and the EAc5 point is not applicable. But that's just my educated guess.