NC-2009 SSp1:Construction Activity Pollution Prevention

ESC Plan and CAPP Plan for Sloped Site

We have a Hotel project which will be constructed on a mountain with the whole site having a slope towards west. The 8 storied building is flush with the mountain such that only one or two sides are having exposure to ambient conditions, remaining sides are flush with the mountain. Now, since the building is located on a sloped terrain, what types of methods are suitable for ESC? The site area is approx 80000 m2 with a building footprint of approx 15000 m2. Do I need to consider the erosion of bare site area (the site areas except the footprint and hardscape/landscape will not be disturbed during construction) and implement measures to control erosion in those areas? Currently the BMPs planned are Fabric fencing, water sprinkling, dedicated areas for washing tools etc..My question is how to control the erosion due to stormwater on this sloped site? Thanks in advance..

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 12/15/2011 - 23:35

Arub, A civil engineer familiar with the site conditions could better answer your question about what BMPs are most appropriate for your site. It sounds like those currently being planned are on the right track and appropriate. You need to consider all erosion and sedimentation that can be attributed to construction activities and the development of the site. In my experience, that generally includes areas that are otherwise undisturbed but still part of the project site and within the LEED boundary.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.