Forum discussion

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction

Form requires photos of moisture control

Has anyone else noticed that the form requires "Upload photos documenting moisture protection methods. Photos should include date and time stamp. Include representative photos of all methods and at least 2 time periods must be included." This sounds like you only need to photograph the moisture protection strategies -- kind of misleading if they are going to require all pictures of housekeeping, pathway interruption, etc. If it's a typo, can it be fixed?

6

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 05/25/2011 - 04:07

I heard a while back that it was not intentional that photo documentation of only moisture control measures was being asked for, and the form would be updated to be broader. However, I would have expected the form to be updated by now, so I don't know if this is still in the works.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.