Hello,
As you know, the LEED online Letter template requires us to input the Manufacturer Name and Model Number of the refrigeration systems being used on the project
The issue we're facing is that the exact models have not been chosen yet. They will be selected and purchased by the contractor based on the performance specifications. The M&E have already specified the max Refrigerant Charges allowed and the fact that CFCs are prohibited.
Knowing that this is a design credit, can I upload the excerpt of specs showing the max Refrigerant Charges and the non-CFC requirement ? Or should I wait till the contractor chooses the models (which is at construction phase)
Thanks for help,
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
April 23, 2011 - 1:23 pm
I would wait till you have the required information and submit at the construction phase.On the other hand, you could try entering the information now as best you can, and you'll have a chance to modify it later if the reviewer questions it.