I often get reports from recycling facilities taking dedicated loads of concrete, wood, gypsum, etc. that state a 100% recycling rate. Taking a conservative approach I typically knock the rate down to 99% thinking there is no way they are recycling at 100% with no waste during their processing.

Does anyone have experience with submitting 100% recycling rates for dedicated load line items? If so please share.....

Yancy