The credit allows project teams to determine their own definition of “low cost.” Energy conservation measures considered “low-cost” are, as a rule of thumb, considered those with an anticipated payback of zero to 18 months. If using a shorter timeframe, project teams should be prepared to justify their decision if needed.
Credits:
Project phase:
Credit tip type: