Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Interior renderings not available for project

NC-2009 PIf4:Schedule and Overview Documents
posted by  Mark Meaders  on 

I have a project that has finished design and construction has not started. One of the items that GBCI requests is a photo or rendering of the interior of the building.

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Aug 25, 2014, 4:37 pm

Shading from Adjacent buildings

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, When modeling Proposed model for LEED and there are shadings from adjacent buildings in it, should these shading be applied also to the Baseline model or they should be omitted like the

3
Mon Aug 25, 2014, 1:57 pm

1 year and 2 year 24 hr design storm

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  sona prajapati  on 

In case 1, we are required to perform a site run off calculation for 1 yr-24 hr design storm and 2 yr-24 hr design storm for both pre- and post- development period.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Mon Aug 25, 2014, 6:43 am

Indoor pool daylighting measurement

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Gary Greenshields  on 

We have a Wellness Center project with an indoor pool area of approximately 6,000 SF and a pool surface area of about 4,000 sf within that space.

4
Fri Aug 22, 2014, 8:23 pm

LEED NC 2009 EAc5 Measurement and Verification

NC-2009 EAc5:Measurement and Verification
posted by  Zeb Foss  on 

I am currently training and researching in order to become involved in the M&V process for various new construction buildings within the near future.

3
Default Avatar
Principal
Sustainability Services
LEEDuser Basic Member
26 thumbs up
Fri Aug 22, 2014, 6:10 pm

WEp1 Exemption?

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Cathal Heneghan  on 

Hi I am working on a CI 2009 project in Dublin, Ireland. The project is an office TI involving the bottom 3 floors of a 5 floor building.

3
Fri Aug 22, 2014, 5:09 pm

rainwater calculation

NC-2009 WEc1:Water Efficient Landscaping
posted by  ebru unver  on 

lansdcape water calculation montly/daily and rainwater Hello, we are collecting rainwater, so to use at the landscape irrigation and to have addition 2 point.

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Fri Aug 22, 2014, 4:56 pm

Psychrometric Chart and 6.1.1 Documentation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Sangmin An  on 

I am in the process of preparing the documentation for this credit but have a few a few questions regarding ASHRAE 6.1.1 Documentation and associated calculations.

3
Fri Aug 22, 2014, 7:34 am

Modeling a humidifier in the baseline case

NC-2009 EAp2:Minimum Energy Performance
posted by  Gustav Alfaro  on 

Hi, I am working on a data center project under NC 2009.

8
Thu Aug 21, 2014, 8:48 pm

Private Bus Service

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Daniel R Gutierrez  on 

Hi all, We are working on a new factory building in an industrial complex. The complex, located in a rural area is at least six miles away from the city boundary.

2
Thu Aug 21, 2014, 2:27 pm