Our project is being submitted for a split review. The design credits have not yet been sent for review to USGBC. The project is entering the physical Construction Phase and as a result Contractor equipment submittals are being reviewed by the CxA. The CxA is reviewing submittals based on a specified set of design documents that the project team agreed would be part of the design credit submission. Since that set of design documents have been issued there have been some changes to equipment and the drawings have been revised to match this new equipment. As a result the contractor submittals dont always match the design documents the CxA is comparing them to.

How should I handle this?