Forum quick links
Comment on Value and Purpose of IEQc3.2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Dale Walsh on
As a Certified Industrial Hygienist with 28 years of experience conducting IAQ assessments and a Masters Degree in Toxicology/Industrial Hygiene with a thesis on new carpet emissions I want to stat
Measuring distance to shower facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by GTF CPRE on
Does anyone have a definitive answer on whether the 200 yard distance from LEED building to offsite showers for SSc4.2 is from LEED Building entrance to offsite BUILDING ENTRANCE, or to the door of
ID Credit for Herbs Garden
NC-2009 IDc1:Innovation in Designposted by MOHD HAFIZI MOHAMAD on
Hi All. Currently, we have more than 10 percent of herbs garden from our total landscape area. Can we scoring one point for ID? Thanks
Water-Jet Marble Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Omar Elrawy on
Dear all, I have a custom shaped (curved) marble flooring, the marble is mineral based, but the supplier will be cutting the marble shapes at his factory, and will be adhering curved p
Hi, We are working on a
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Neetika Parmar on
Hi, We are working on a refinery located in a remote/restricted area and hence there is no public bus access within 1/4 mile of the project.
Hi !
Are 10 basic services
NC-2009 SSc2:Development Density and Community Connectivityposted by Neetika Parmar on
Hi ! Are 10 basic services limited to only those mentioned in LEED NC 2009 or can we include other services to target credit for community connectivity ??
ASHRAE definition of "kitchenette"
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ritwik Kakati on
Does anyone know how ASHRAE defines a "kitchenette" from a regular kitchen? I am trying to determine which value I should use from Table 6-4 of 62.1-2007.
LEED-CS potential ID credits
CS-2009 IDc1:Innovation in Designposted by Angela Mai on
I have a commercial client who is the owner of a new-construction, multi-tenant building entering the final review phase of LEED-CS. I have a few questions about potential ID credits: 1.
Service Bay Entries
Pilot-Credits PC14:Walkable Streetsposted by Anthony Bandy-Zalatoris on
The architect of our project created a design where there is no "back" of the building - the street-side elevation is nearly identical to the rear (parking lot and service side).
Recycling Facility Letters of Certification
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?