Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Comment on Value and Purpose of IEQc3.2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Dale Walsh  on 

As a Certified Industrial Hygienist with 28 years of experience conducting IAQ assessments and a Masters Degree in Toxicology/Industrial Hygiene with a thesis on new carpet emissions I want to stat

2
Default Avatar
LEEDuser Basic Member
1 thumbs up
Wed Sep 24, 2014, 1:45 am

Measuring distance to shower facilities

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  GTF CPRE  on 

Does anyone have a definitive answer on whether the 200 yard distance from LEED building to offsite showers for SSc4.2 is from LEED Building entrance to offsite BUILDING ENTRANCE, or to the door of

6
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Sep 23, 2014, 6:12 pm

ID Credit for Herbs Garden

NC-2009 IDc1:Innovation in Design
posted by  MOHD HAFIZI MOHAMAD  on 

Hi All. Currently, we have more than 10 percent of herbs garden from our total landscape area. Can we scoring one point for ID? Thanks

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Tue Sep 23, 2014, 3:54 pm

Water-Jet Marble Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Omar Elrawy  on 

Dear all, I have a custom shaped (curved) marble flooring, the marble is mineral based, but the supplier will be cutting the marble shapes at his factory, and will be adhering curved p

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Sep 23, 2014, 12:55 pm

Hi, We are working on a

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Neetika Parmar  on 

Hi, We are working on a refinery located in a remote/restricted area and hence there is no public bus access within 1/4 mile of the project.

2
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Tue Sep 23, 2014, 12:43 pm

Hi !
Are 10 basic services

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Neetika Parmar  on 

Hi ! Are 10 basic services limited to only those mentioned in LEED NC 2009 or can we include other services to target credit for community connectivity ??

2
Tue Sep 23, 2014, 12:41 pm

ASHRAE definition of "kitchenette"

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Ritwik Kakati  on 

Does anyone know how ASHRAE defines a "kitchenette" from a regular kitchen? I am trying to determine which value I should use from Table 6-4 of 62.1-2007.

7
Mon Sep 22, 2014, 7:33 pm

LEED-CS potential ID credits

CS-2009 IDc1:Innovation in Design
posted by  Angela Mai  on 

I have a commercial client who is the owner of a new-construction, multi-tenant building entering the final review phase of LEED-CS. I have a few questions about potential ID credits: 1.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 22, 2014, 6:37 pm

Service Bay Entries

Pilot-Credits PC14:Walkable Streets
posted by  Anthony Bandy-Zalatoris  on 

The architect of our project created a design where there is no "back" of the building - the street-side elevation is nearly identical to the rear (parking lot and service side).

2
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Sun Sep 21, 2014, 9:13 pm

Recycling Facility Letters of Certification

NC-2009 MRc2:Construction Waste Management
posted by  John Covello  on 

I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?

5
Default Avatar
Senior Sustainability Manager
UL Solutions
LEEDuser Premium Member
7 thumbs up
Sun Sep 21, 2014, 8:48 pm