Emergency Exits

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Dave Hubka  on 

Hello all, Regarding emergency exits, we recieved the following review comment on our LEED Volume program submission: "Emergency exits must prohibit smoking within 25 feet.

2
sustainability consultant
Wahdj
LEEDuser Premium Member
4 thumbs up
Wed Oct 15, 2014, 2:37 pm

dynamic glass

CS-2009 EAp2:Minimum Energy Performance
posted by  Dave Hubka  on 

Can benifits of glass, that automatically change VLT and SHGC based on the position of the sun, be garnered in the proposed model?

2
Wed Oct 15, 2014, 12:31 pm

In which construction phase can I certify my building?

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Hazem Yusuf  on 

Construction phase of an office building is consisting of multi stages.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Oct 15, 2014, 8:25 am

One or two separate buildings

NC-2009 PIf1:Minimum Program Requirements
posted by  Felipe Holguin  on 

I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both bu

4
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Oct 15, 2014, 1:08 am

External Lightning Exceptions

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi everyone, It is necessary to prove the power density in external illuminations with the following characteristics: - Accent lighting (lighting focused on plants and trees) - Lighting for vi

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 14, 2014, 12:54 pm

Baseline systems - heating only

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

The project I'm working on currently is for a production plant and office zones all in one building.

5
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Oct 14, 2014, 12:00 pm

Conventional and metering faucets

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Noriko Nagazumi  on 

Our project has conventional faucets and metering faucets on the same floor. Each of these faucets have different defined baselines.

2
Principal
Sustainable Integration LLC
LEEDuser Basic Member
12 thumbs up
Tue Oct 14, 2014, 7:51 am

Equipment Capacity for Design and Baseline Case

NC-2009 EAp2:Minimum Energy Performance
posted by  April Brown  on 

Hi Marcus et al., I received a question from one of our project energy modelers that I cannot answer - Recently we have been receiving a new comment on EAp2 that states “The HVAC equipment cap

6
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Tue Oct 14, 2014, 12:32 am

Re-applying for a credit approved in Design submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Shivani Langer  on 

At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.

7
Director of Sustainability
HMC Architects
LEEDuser Premium Member
20 thumbs up
Tue Oct 14, 2014, 12:20 am

Time Setpoint No Met & Setback Temperatures

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 13, 2014, 5:09 pm