Forum quick links
Emergency Exits
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Dave Hubka on
Hello all, Regarding emergency exits, we recieved the following review comment on our LEED Volume program submission: "Emergency exits must prohibit smoking within 25 feet.
dynamic glass
CS-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Can benifits of glass, that automatically change VLT and SHGC based on the position of the sun, be garnered in the proposed model?
In which construction phase can I certify my building?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Hazem Yusuf on
Construction phase of an office building is consisting of multi stages.
One or two separate buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Felipe Holguin on
I have a project with two buildings that are attached physically by two underground levels with services as parking spaces, bicycle racks, showers and bathrooms and MEP systems shared for both bu
External Lightning Exceptions
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi everyone, It is necessary to prove the power density in external illuminations with the following characteristics: - Accent lighting (lighting focused on plants and trees) - Lighting for vi
Baseline systems - heating only
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
The project I'm working on currently is for a production plant and office zones all in one building.
Conventional and metering faucets
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Noriko Nagazumi on
Our project has conventional faucets and metering faucets on the same floor. Each of these faucets have different defined baselines.
Equipment Capacity for Design and Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by April Brown on
Hi Marcus et al., I received a question from one of our project energy modelers that I cannot answer - Recently we have been receiving a new comment on EAp2 that states “The HVAC equipment cap
Re-applying for a credit approved in Design submittal
posted by Shivani Langer on
At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.
Time Setpoint No Met & Setback Temperatures
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours?