Recent

Wood wallbase

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Devani PERERA  on 

Has anyone seen a floorscore for wood wall base? We have awood wallbase that is manufactured by the millwork contractor.

3
Default Avatar
Green Building Consultant
Elan
LEEDuser Basic Member
15 thumbs up
Tue Apr 14, 2015, 2:37 pm

Transitional Entry Atrium Lobby belong in Energy Model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Joyce Kelly  on 

A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 14, 2015, 4:55 am

Option 3

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Mike D  on 

For option 3, do measurements have to be taken more than once?

3
Default Avatar
LEEDuser Basic Member
45 thumbs up
Mon Apr 13, 2015, 3:02 pm

Option 3 daylight measurement

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Stella Stella  on 

Hi, We are proposing to carry out the Option-3 daylight measurement in our project to demonstrate compliance.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Mon Apr 13, 2015, 1:27 pm

Level of Participation by Enhanced CxA in Fundamental Cx Tasks

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Annalise Reichert  on 

We are currently working on a project where an independent third party was contracted to perform Enhanced Commissioning tasks, and a disinterested employee of the General Contractor performed Funda

3
Sat Apr 11, 2015, 6:47 pm

Regularly Occupied Space

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Saul Pichardo, AIA  on 

Hello, Where can I find information on what is considered "regularly occupied space" in a warehouse facility that has most of its space dedicated to product storage and much of the open area used

2
Sat Apr 11, 2015, 3:06 pm

Shade from trees outside of site

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Summer Gorder  on 

Can the shade from tree canopy include trees that are outside of the project boundary?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Apr 11, 2015, 6:30 am

Feedback on the LEED 2009 ACPs for Projects Outside the U.S.

General forums
posted by  Deon Glaser  on 

Hello everyone, After working at USGBC for the past 5 1/2 years, I have recently transitioned into a role overseeing the LEED 2009 ACPs for Projects Outside the U.S.

11
Environmental Engineer
LEEDuser Basic Member
11 thumbs up
Fri Apr 10, 2015, 5:41 pm

Doubling Area

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Karen Loysen  on 

A site has reflective pavement (SRI 29+) that is partially shaded by trees. Do I count that area as shaded and subtract it from the area of reflective pavement?

3
Fri Apr 10, 2015, 3:22 pm

Parking garage exhaust air rate - LEED CS v3

General forums
posted by  Francesco Allaix  on 

Hello, Our project has an underground parking garage.

3
Fri Apr 10, 2015, 12:41 pm