Mop sink in v4
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Lissa Spitz on
Hi, our project is a data center that shares toilets in an adjacent building. The only plumbing fixtures in the DC are a mop sink and eyewash units. Can we achieve the WE indoor prereq?
Campus-Wide Recycling Program
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Daniel Montgomery on
I'm working on a new classroom building on a university campus. The university's cleaning service picks up trash and recycling daily from all of the classrooms, hallway receptacles, etc.
VVT System
NC-2009 IEQp1:Minimum IAQ Performanceposted by Brian Kenney on
Hello, We have a design completed in California with constant volume packaged rooftops controlled as a VVT system. The owner is contemplating getting LEED certification.
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.
Points
Homes-v4 MRc2:Environmentally preferable productsposted by Julie Hardy on
Could you help me understand how the credit calculation works? I am not sure I understand it properly.
Reverberation Time and Volume
NC-v4 EQc9:Acoustic performanceposted by Avtua Kraveishvili on
Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec.
Reverberation Time and BIG Open Area
NC-v4 EQc9:Acoustic performanceposted by Avtua Kraveishvili on
If open plan office is linked with entrance, guest circulation areas and corridors from another zone (which totally takes about 2'000 m2), how we can calculate and predict Reverberation Time?
2012 EPA CGP comply with this prerequisite?
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Pamela Svetllana Santos Souza on
I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA CGP can be used instead of 2003 EPA CGP to comply with this prerequisite?
EBOM-v4 MRc2: Purchasing - lamps as an ID credit
CS-2009 IDc1:Innovation in Designposted by José Solis on
I'm not sure where to post a question about this credit as we are submitting it as an ID credit under Core and Shell v2009. I'm not sure how to proceed.
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?