Forum quick links
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Reference for the Total Daily Uses numbers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neshat Sakeena on
Hello, I was just wondering if anyone knows the reference or basis of the numbers used in Table 2. Default Fixture Uses, by Occupancy Type in the LEED manual?
Code is surpassing 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Amrit Kaur on
In a Jurisdiction where code is surpassing ASHRAE 90.1-2010 LEED buildings are required (by code) to meet the more stringent requirements but measure their energy score based improvement from ASHRA
Surrounding Area / Areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Omar Elrawy on
If a smoking zone is surrounded by 2 zones, is it sufficient to measure the differential pressure with respect to the zone where a door exist, or I must conduct measurement with respect to each zon
Pilot Program
EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
Good Afternoon, We cannot complete the existing credit as we cannot meet any of the Cases / Options. There is no Energy Star rating for dairies...
Shuttle Service Still Eligible?
CI-v4 LTc3:Access to quality transitposted by Brian Salazar on
Under v3, if a shuttle service was provided by the employer or landlord within 2 miles of a major transit hub such as light rail, bus terminal, or commuter rail, a project would be awarded these po
Peak electricity demand
CS-v4 EAc4:Demand responseposted by Tobias Berge on
A LEED v 4 Core & Shell Project in Sweden (office and hotell) will try to apply for this credit.
Nutrients for Plants
Pilot-Credits SSpc82:Local food productionposted by LEED Team DC on
We are exploring this pilot credit for a back of house hotel building and would like to use hydroponics.
District Energy - 3rd Party Analysis Requirements
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Phil Stafa on
Regarding EAp3 for a district energy system, do all chillers included in the district plant (CFC and non-CFC) need to be included as part of the alternative compliance simple payback analysis? Do
Showerhead with multiple settings
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by AtSite Inc on
To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.