Forum quick links
Regularly Occupied Spaces
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular
historic district
NC-v4 LTc3:High priority siteposted by sepideh khodadadi on
can anyone explain historic district? i don't exactly know what that is
Systems Observed In Person
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Devki Wright on
Our CxA wasn't able to observe lighting controls in person when he came to commission the other building systems.
Previously Developed Buildings exemption
Homes-v4 LTp1:Floodplain avoidanceposted by Joanne Sawatzky on
What is meant by 'previously developed buildings'? We have a project where there are existing residential buildings on a site that will be demolished for new residential buildings.
CI minimum scope of work?
posted by Michael Smithing on
Is there a minimum scope of work to certify a project under LEED CI?
performance period for re-certification
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Pablo Fortunato Suarez on
The LEED Re-certification Guidance document recommends submission of purchases of the most recent 25% of performance period. Are we allowed to include data prior to that period as well?
tools
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Emmanuel Pauwels on
Is one click LCA an accepted tool to demonstrate compliance with this credit?
Two buildings on one project site
CS-2009 IEQp1:Minimum IAQ Performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Option 2 Meaning of "Contiguous Area"
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Daniel Smith on
Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe
waste audit documentation
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Fareed Alghimlas on
we are working on performing a daily waste audit for the building, my question is : do we document the outcomes of just one day of the waste audit during the performance period?