Appeal after final review
posted by Catharina B on
Hi Project is after final Design & Construction Review. GBCI denied few credits and we have 25 business days to appeal the results of the Final Review.
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
90.1-2007 G3.1.1 exception d vs 90.1-2010 exception c
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Exception c requires that lab spaces use a system 5 or 7 in the same way that exception d does, but exception c does not prescribe any specific turn down during unoccupied periods.
Refurbishing of historic windows
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Kath Williams on
Windows in our historic building project have been removed, refurbished, glass upgraded to double-pane, low-e, etc. Can we use frames under MR c1 Building Reuse and MR c5 Regional Materials?
Occupancy Counts differ from workstation count significantly
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Vanessa Seibert on
I'm working on a 800,000 s.f. high rise building with 40 tenants.
Rainwater Harvesting for Toilet Flushing
NC-v4 WEp2:Indoor water use reductionposted by Patrice McVeigh on
Hello all, Can rainwater harvesting be used to reduce the indoor water consumption percentage?
Average Leed Recycling percentage for a large ground up building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Jamie Knoblock on
I was wondering if anyone would know what the average Leed recycling percentage is on a large ground up hospital on a construction site across the united states , thank you.
WEp1 calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Muriel Alvarez on
Dear Since I have a problem with BETA version for WEp1, the form did not calculated the percentage correctly, I´ve decided to use the v06 form calculator, well...
Metered Lav Faucets No More
CI-v4 WEp1:Indoor water use reductionposted by Michelle Rosenberger on
I posted this comment on the NC forum in addition to here because there haven't been any responses to questions posed on this forum.
UPLOAD GOOD LITERATURE
NC-2009 SSc1:Site Selectionposted by bojana kovacevic on
If someone has good literature ( with clearly defined part for required documentation) of all SS and MR Credits I would be so happy if he/she share it with me.... Best regards!