Forum quick links
Modification to base building systems
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ben Hollon on
I feel like I've seen parts and pieces of this question in various posts but never asking it directly.
LCA questionnaire for Master thesis
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Arturs Alsins on
We are three students writing our respective theses on building life-cycle assessment and the tools related to it - your time filling up our questionnaire would be much appreciated and help us achi
Certificate timeline
ND-Plan-v4 GIBc1:Certified green buildingsposted by soha yamani on
I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your neigh
View Preserving Automated Shades
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Maya Donelson on
For Option 1, Path 2 using the daylight and views calculator we are trying to a factor that meets the requirement.
New Prerequisite at 18% affect 90.1 2010?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
This might have been asked before but will the new 18% prerequisite affect the projects following ASHRAE 90.1 2010 adjusted point scale for LEED 2009? Thanks.
Multiple Building HVAC system
posted by Paula Hernandez on
Hello, We have two buildings in the same Project boundary, as far as I understand, this would be a Group Building Certification. The HVAC system will be variuous VRF systems, each for each floor of
Building Footprint
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by O Moltay on
We have a residential project. My question about with building footprint. First floor have corbelled balcony. So, ground floor footprint excluded, balcony.
PIf2 form filling
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Lorenna Lobo on
While filling the PIf2 form, in "site characteristics" it asks what is the total site area within the LEED project boundary, but the project is just a tenant space, should I put 0?
ID Credit for CSv 2009 Project
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by José Solis on
Is it possible to use this credit as an ID credit for a CS v2009 project? Could we achieve it if we write the requirements into the tenant lease language or the binding tenant requirements?
Same Landscaped Area but Different Plantings?
CS-2009 WEc1:Water Efficient Landscapingposted by Brian Salazar on
I should know this, but.... Is it OK to run the WEc1 calcs with the same landscaped area (in square feet), but with different plantings in the baseline and design cases?