Towers as part of a single building

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.

1
Thu Mar 3, 2016, 3:33 pm

MBTU = 1 million BTU, which is also MMBTU

General forums
posted by  Jamy Bacchus  on 

It's come to my attention that there's some unit confusion in the LEED Treatment of District Thermal Energy Guide where DES virtual rates are calculated. The Guide includes equations on page 14 in

1
Thu Mar 3, 2016, 3:12 pm

Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Antje Holdefleiss  on 

Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?

1
Wed Mar 16, 2016, 6:56 pm

Glass Demo

NC-2009 MRc2:Construction Waste Management
posted by  Donald Green  on 

Has anyone had any luck recycling glass taken from a commercial building? They are double pane commercial units removed from the curtainwall system.

1
Thu Mar 3, 2016, 4:10 pm

WEc1 - We don't really have a "SITE" outside of the building env

Retail-NC-v2009 WEc1:Water efficient landscaping
posted by  Lou Niles II  on 

Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr

1
Sat Aug 26, 2017, 11:54 pm

Existing Lighting in a TI

CI-2009 EAp2:Minimum Energy Performance
posted by  Annalise Reichert  on 

I am working on a TI retrofit project that did not replace any existing lighting in their space due to budget constraints.

1
Thu Mar 3, 2016, 9:27 pm

Submitting for a CIR or LEED Interpretation

General forums
posted by  Deborah Lucking  on 

We understand that the only way to submit for a CIR is through the registered project LEED Online platform.

0

Painting/coating in tenant space

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Indochine Engineering VN  on 

Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.

1
Thu Jan 19, 2017, 10:50 am

Pursing credit in an existing building

Pilot-Credits EQpc78:Design for active occupants
posted by  Dee Spiro  on 

Our project involves renovating an existing building on a university campus.

0

Implementing on a university campus

Pilot-Credits PC14:Walkable Streets
posted by  Dee Spiro  on 

When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.