Re-Appeal for a data center
posted by Jordan Kirrane on
Hi, We have a project that underwent an appeal in order to get EAp2/c1. The results of the Appeal (D+C) were that the prereq was granted, but not the points from the credit.
Recycling Areas for Multifamily/commercial project
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rob Hink on
I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.
Sedum as native plants
CS-2009 WEc1:Water Efficient Landscapingposted by Dave L on
Hi, I have been advised that the sedum plants would meet this credit on green roofs due to the fact that the plants would be indigenous for landscaping in general.
Retail in a large building
Retail-CI-v2009 EAc5:On-site renewable energyposted by Maria Isabel Conde on
We are certifying a small retail store that is almost 5 percent of the total building area. The retail store shares a chilled water plant with the rest of the building.
Transients for complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by David Browne on
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building
Senior Care/Assisted Living Facilities
NC-2009 EAp2:Minimum Energy Performanceposted by Carrie Webster on
Is anyone aware of exemptions or opportunities to take additional credit for senior care/assisted living facilities?
Captured and Conveyed to on-site retention areas
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Bridget Brock on
We are having a hard time determining how to calculate the flow quantities for our site when it has been designed so all of the run off is captured and conveyed to on-site retention ponds.
EA Prerequisite 2
CI-2009 EAp2:Minimum Energy Performanceposted by Poorva Keskar on
In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.
Cycle network, paths?
NC-v4 LTc6:Bicycle facilitiesposted by Karen Elliott on
Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!
Furniture Only?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Lida Lewis on
Without guidance on "Other USGBC approved multi-attribute certification programs" outside of BIFMA, we plan to submit this Pilot Credit wholly on the furniture dimension of our project. We used Kn