Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Re-Appeal for a data center

General forums
posted by  Jordan Kirrane  on 

Hi, We have a project that underwent an appeal in order to get EAp2/c1. The results of the Appeal (D+C) were that the prereq was granted, but not the points from the credit.

0

Recycling Areas for Multifamily/commercial project

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Rob Hink  on 

I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.

0

Sedum as native plants

CS-2009 WEc1:Water Efficient Landscaping
posted by  Dave L  on 

Hi, I have been advised that the sedum plants would meet this credit on green roofs due to the fact that the plants would be indigenous for landscaping in general.

0

Retail in a large building

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Maria Isabel Conde  on 

We are certifying a small retail store that is almost 5 percent of the total building area. The retail store shares a chilled water plant with the rest of the building.

1
Fri Apr 8, 2016, 10:51 pm

Transients for complex occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  David Browne  on 

In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building

1
Fri Mar 18, 2016, 3:12 pm

Senior Care/Assisted Living Facilities

NC-2009 EAp2:Minimum Energy Performance
posted by  Carrie Webster  on 

Is anyone aware of exemptions or opportunities to take additional credit for senior care/assisted living facilities?

1
Thu Feb 18, 2016, 3:24 pm

Captured and Conveyed to on-site retention areas

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Bridget Brock  on 

We are having a hard time determining how to calculate the flow quantities for our site when it has been designed so all of the run off is captured and conveyed to on-site retention ponds.

1
Thu Feb 18, 2016, 8:26 pm

EA Prerequisite 2

CI-2009 EAp2:Minimum Energy Performance
posted by  Poorva Keskar  on 

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope.

1
Fri Feb 19, 2016, 4:10 pm

Cycle network, paths?

NC-v4 LTc6:Bicycle facilities
posted by  Karen Elliott  on 

Does anyone know if paths used for pedestrians and cyclist count as 'off Street' bicycle network. Thanks!

1
Thu Feb 25, 2016, 11:37 pm

Furniture Only?

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Lida Lewis  on 

Without guidance on "Other USGBC approved multi-attribute certification programs" outside of BIFMA, we plan to submit this Pilot Credit wholly on the furniture dimension of our project. We used Kn

0