Forum quick links
Paints or sealants applied before building is sealed
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patrice McVeigh on
Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?
CHP Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies
Actual Use vs Indicated Use
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Emmanuel Pauwels on
We will use a Contact Adhesive which is a one-part solvent-based high performance contact adhesive with
Natural Ventilation Savings
NC-2009 EAp2:Minimum Energy Performanceposted by Marcus Sheffer on
I may have helped you, now it's your turn to help us all. The USGBC is seeking input and information related to the modeling of naturally ventilated and naturally conditioned buildings.
Natural Ventilation Savings
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
I may have helped you, now its your turn to help us all. The USGBC is seeking input and information related to the modeling of naturally ventilated and naturally conditioned buildings.
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Project Building Context
NC-2009 PIf2:Project Summary Detailsposted by Deirdre Espiritu on
Where can I find guidance on what density is considered Urban or SubUrban?
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
storage of rain water
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Does the storage of rain water contribute to achieve this prerequisite? The project will irrigate the outdoor vegetation only with rain water.