Corded and battery powered definition
posted by Martha Norbeck on
Keyboards, docking stations, mice, surge protectors - technically these are corded/battery powered items purchased during the performance period. They are not eligible for an Energy Star rating.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in Designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
would an aerobics room be considered classroom?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Im not sure if we should considered an "aerobics room" a classroom and therefore as part of the multi-occupant areas to have individual control?
Credit requirement language
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Ben Campbell on
Has anyone else experienced that the pilot credit requirement language is vague in spots?
Excluding Areas
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Garrett Ferguson on
1. My question is about how to correctly exclude areas in these calcs.
Baseline existing building envelopes
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.
should an aerobics area be multi-occupant for IEQc6.2?
posted by Saju Varghese on
Should an aerobics classroom area be considered as a multi-occupant area under IEQc6.2? It is not really an area were you do presentations or training but exercising classes.
EA Prerequisite Minimum Energy Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Jordan Kirrane on
I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2.
IEQc4 - Schools v2009- Alternative Compliance from CA to SCAQMD
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Z Smith on
We are working on a LEED Schools v2009 project.
Asbestos Abatement Requirement Compliance
NC-2009 SSc3:Brownfield Redevelopmentposted by UO Design and Construction on
We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.