Forum quick links
please post to a SPECIFIC LEEDuser forum
EBOM-2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
Hi. This LEEDuser forum is specifically about completing the PI form 1. Most people's questions here are about either policy compliance with MPRs, or about the review process.
please post to a SPECIFIC LEEDuser forum
Retail-CI-v2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
Hi. This LEEDuser forum is specifically about completing the PI form 1. Most people's questions here are about either policy compliance with MPRs, or about the review process.
please post to a SPECIFIC LEEDuser forum
Retail-NC-v2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
Hi. This LEEDuser forum is specifically about completing the PI form 1. Most people's questions here are about either policy compliance with MPRs, or about the review process.
please post to a SPECIFIC LEEDuser forum
Healthcare-v2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
Hi. This LEEDuser forum is specifically about completing the PI form 1. Most people's questions here are about either policy compliance with MPRs, or about the review process.
Design for Active Occupants
Pilot-Credits EQpc78:Design for active occupantsposted by Kena David on
Our project team found this credit to be very useful as occupant health is big buzz in the green building market.
EP for Subway Stations
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kerrie Racicot on
Hi there! Our project is located within 1/2 mile walking distance of a subway station that serves multiple lines.
Amenities Within Main Building
posted by Aswin M on
We have a Retail Commercial Interior project inside a Main building.
MET Rates
NC-2009 IEQc7.1:Thermal Comfort—Designposted by SAMY Chamy on
1.What is a MET rate for Sewing machine workers (Jeans cloth stitching) 2.Is it acceptable to get this credit using Design alternative (HVLS Fans or Evaporative Cooler) 3.How we achieve this credit
Waste Heat Recovery Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear All:- we have two waste recovery boiler to fulfil the steam needed.
MERV 13 relaxed
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sinead Butler on
Hi All, I am working on a project with a Full Fresh Air HVAC System i.e. No recirculation, while the toilet ventilation system is full extract to the atmosphere.