Forum quick links
"Material Value" in LEED credit calculation
posted by Nasim Daryaee on
Hi every one, I have a general question regards definition of " Material Value" .ie, my structure steel value in the manufacture is 200K and the cost I paid to my sub after fabrication ...
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum Energy Performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Wood stair
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by LEEDme Lorenzi on
Good morning, We have a wood stair (wooden steps covered with another wood species) that is manufactured by the millwork contractor. The scale is a custom made design.
Option 3 Guidance Now Available!
CS-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
The actual points won't be achievable for a few months, but USGBC has released implmentation guidance. Please see the details here:
PV system on Conference Center
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Patrick Cellie on
Hi, a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit: - the building doesn't use any of the ener
Community Center with Showers
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Saju Varghese on
We have a facility that will provide a gym, art classes, weight area, aerobics, etc. It its mostly health activities related facility.
gym facility showers
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Saju Varghese on
I'm working on a community center that pretty much works as a facility.
Existing and new fixtures
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Saju Varghese on
I have a facility that will be LEED NCv2009 certified and is part existing and partly new.
non-inpatient areas
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Erin Holdenried on
I am confused by this credit. Can non-inpatient areas that fall outside the 15' perimeter be excluded?