Hi,

a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit:
- the building doesn't use any of the energy
- RECS are not owned by the building in any way.

So I'm wondering if we can get this credit and I have some questions:

- is there any specific size the PV system needs to be? this PV system is 99 kW
- is there any other technical requirement the system needs to meet?

Thanks in advance for your response.
- EAc4