Update on USGBC approved multi-attribute certifications?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Landry Watson on
Question: Have we any new updates or additional guidance on what certification that Div 9 (finishes) materials should achieve?
Commissioning Starting After 50% CDs
NC-2009 EAc3:Enhanced Commissioningposted by Sara Zoumbaris on
I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr
mixed use
posted by FABIO VIERO on
Hi all, we are working on a refurbishment project located outside US and we are looking for applying LEED v4. The four stories building consist in a mix use as follows: • Museum: more than 75% GFA
How do we show for compliance for non-occupiable spaces?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Logan Dorrell on
I'm a little confused by what we are supposed to show to document compliance for non-occupiable spaces, like restrooms, that the space matrix call out as "N (VRP) / Y (other req's). We have filled
Calculating Ds for cooling condition
NC-2009 IEQp1:Minimum IAQ Performanceposted by William Beechinor on
Hello, I am trying to determine whether or not I am calculating Ds correctly.
is a BMS necessary?
NC-2009 EAc5:Measurement and Verificationposted by Alfonzo Collins on
The building we’re for which considering M&V will have 14 submetered apartments (which includes the condensing unit for each), as well as a house meter, for electricity (gas will be on one main
Material reuse calculation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jen Roberts on
The second example on pg 536 of the reference guide is a bit confusing.
Water Use Reduction Calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Susannah Goddard on
I'm hoping to run by our approach to achieving WEp1 by some experienced LEED APs in the hope to reassuring myself that our approach is acceptable before submitting to USGBC at appeal.
Aquifer for cooling
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Erik Nordlund on
I have a project where the project team are planning to partly cool the building using an aquifer.
VOC Meters
posted by Johanna Hendricks on
Has anyone purchased a meter for the annual VOC testing? If so, can you tell me the make/model information and if it worked well? Thanks for any help!