Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Low-Emitting Signage Wording Requirements

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Annalise Reichert  on 

I am working on a project that reserved 10 parking spots for "fuel-efficient" vehicles, this is noted by spray-painted signage on each parking stall.

1
Tue Oct 27, 2015, 1:52 am

Design Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Omar Elrawy  on 

Dear all, I'am in the "design appeal" stage now, I'am willing to accept the final design review, but I have two questions: 1.

1
Tue Oct 27, 2015, 9:06 am

source of air for mechanical Ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu

1
Wed Oct 28, 2015, 12:29 am

Free Certification

General forums
posted by  Charalampos Giannikopoulos  on 

Does USGBC still offer to refund LEED certification fees to the first LEED certified project in a country with no LEED projects at all?

1
Mon Nov 9, 2015, 6:21 am

Adoption of Investigated Strategies

NC-v4 IPc1:Integrative process
posted by  Philippa Cameron  on 

Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit?

1
Wed Oct 28, 2015, 3:31 pm

Green Cleaning Plan Compliance

NC-2009 IDc1:Innovation in Design
posted by  Michelle Rosenberger  on 

I understand the use of the EBOM green cleaning requirements to establish your plan for an NC ID credit. However, an intrinsic part of an EBOM plan is the compliance metrics.

1
Fri Nov 27, 2015, 9:17 pm

Children's Inpatient Hospital - Family visitors

Healthcare-v2009 WEp1:Water use reduction
posted by  Michelle Robinson Schwarting  on 

In a children's inpatient hospital you have lots of individual patient rooms, each with their own private bathroom.

1
Wed Oct 28, 2015, 10:07 pm

Excluding demand for occupancy sensors in retail sales area

Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controls
posted by  Eleftherios Zacharakis  on 

I have a retail store that the sales area is always occupied and therefore not on occupancy sensor. The sales floor is on a time clock instead. The rest of the store is on occupancy sensor.

0

Multifamily Residential compliance:

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Mike Stopka  on 

Multifamily: For a small unit, you may only need a single control—it can be a window or a thermostat.

1
Mon Nov 30, 2015, 11:23 pm

Site Accessment with Major Renovation

NC-v4 SSc1:Site assessment
posted by  Parker williams  on 

If we are proposing new construction, major renovation, how would this credit work? --If there is minimal exterior site on a large building.

1
Tue Nov 3, 2015, 9:17 pm