Forum quick links
Fan Power for Proposed model
NC-2009 EAp2:Minimum Energy Performanceposted by Graham Langton on
Outside complying with the fan power limitations - Can the fan power in the proposed model be based on final commissioning data or must it be the design data? Thanks
CSR following UN Global Compact
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Ana García on
Hello! U.N. Global Compact - Communication of Progress is a LEED compliant CSR frameworks.
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
Temperature & Ventilation
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Sabrina Cescolini on
Hello everyone, This question references LEED CI Canada version 1.0. The credit language makes it seem like thermal AND ventilation controls must be provided for: - 50% of individual spaces / ope
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
Pilot Credit Usability
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Chloe Bendistis on
I have pursued this Pilot credit on several LEED projects over the past year and I'm happy to report that it has gotten significantly easier to document credit compliance.
Regularly occupied area included in 8.1 but excluded in 8.2
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ashley Love on
I am working on credits 8.1 and 8.2 for a school (LEED 2009 Schools).
Demolition records lost
NC-2009 MRc2:Construction Waste Managementposted by Lara Branco on
Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet
Occupant Default Density vs. Actual density
CS-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, we are working on a C&S Mall project, is it permitted that we uncheck the Default density checkbox in IEQp1 form, and enter expected number of persons based on Architects / Engineers ex
data center equipment not listed in DOE Energy Star categories
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Gail Napell on
Servers are listed on the Energy Star website, but not receivers. Is it safe to assume they are still not Energy Star eligible?