Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Does a Party wall count for the Window to wall ratio?
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi there, Im modelling a corner building, which has two adjacent buildings so only the façades facing the street are in contact with the exterior environment.
Path 10
CI-2009 SSc1:Site Selectionposted by Rodrigo Gomez Junco on
We are pursuing SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is, do I need the Tenant Lease Agreement from the CS project in order to document this credit?
LEED 2009 IEQc6.2 Thermal Comfort LEED Letter Template
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Greg Snow on
Hi Everyone, I was searching the toolkit to find samples of the LEED Letter Template for this Credit bu I couldn't .
Maximum number of ID points allowed
CI-2009 IDc1:Innovation in Designposted by javier torres on
Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.
EBOM SSc2: policy vs practice for snow removal
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Drew DePalma on
Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.
Changes during Design Review
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, We are currently responding to LEED Reviewer comments for a building.
Garage Lighting LPDs
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Snider on
ASHRAE lists .2 w/sf for garage spaces in Space by Space, and .3 w/sf in Building Area method.
What if landscaping isn't installed yet?
EBOM-2009 WEc3:Water Efficient Landscapingposted by Vanessa Seibert on
We are in the PP but do not have our low-water landscaping installed. A contract will be signed to install it prior to the end of the PP. Has anyone obtained the credit this way?
Innovation in Design Path 1 & Exemplary Performance Path 2
CS-2009 IDc1:Innovation in Designposted by Maggie Hogan Skaug on
1) It is my understanding that a project may pursue BOTH Path 1 and Path 2 to attempt up to 5 credits in this category.