62MZ calc for critical zones
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.
HVAC duct insulation adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gaura Saxena on
Hi For a project using an adhesive for HVAC duct insulation, what should be the VOC limit that should be followed for since the standards does not mention any value directly for the insulation adhe
Facility Summary
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
LEED Online requests a copy of the complete Statement of Energy Performance (SEP).When generating the statement, it is noted to make sure to select the following report options: Statement of Energy
Roof/Terrace
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Lauren Bellamy on
The project I am working on has a canopy over a terrace, and below the terrace is conditioned space.
District graywater recycling system
NC-2009 WEc3:Water Use Reductionposted by Brian Meinrath on
I am working on a large project that includes over 10 buildings.
High Pressure Sodium lamps--interior or exterior?
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Maria Unruh on
The table MRp2-2, is this for HPS lamps for the entire project or for the interior only?
Natural Ventilation on HAP
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
Hey All, This question is basically for the energy modelers out there who use HAP or any other software. I have a conditioned lobby where the fan coil just uses the return air, according to our ca
Injected foam insulation with 0 g/L VOCs
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Erin Holdenried on
I have a project using Injected foam insulation with 0 g/L VOCs. Does this product meet the credit intent? Or must it meet the specific CDHS testing requirements?
Multiple Building or One Building?
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Muge Karasahin on
We have a large scale international project, consists of five attached building blocks (A-B-B1-B2-C) that share 7 basement and 7 ground up floors but each have different amount of total floor level
Historical Landmark
CS-2009 EAp2:Minimum Energy Performanceposted by Muge Karasahin on
We have a large scale international project in the eastern Europe.