Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Area allocated for recyclables

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Devanand Ragbir  on 

Reference calculation is based on 'sqft of the building' . Does the sqft of the building will have to include the parking area also(example basement parking)

1
Wed Jul 8, 2015, 2:06 am

CI 2009 SS C2

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Neil Rosen  on 

Can a golf course be used as a park in SS C2 Community Connectivity?

1
Wed Dec 30, 2015, 5:37 pm

School Facilities

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Neil Rosen  on 

Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?

1
Wed Dec 30, 2015, 5:29 pm

Addressing Only Portions of Credit Requirements

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Michelle Rosenberger  on 

I have received a review comment on MRpr1 that indicates that I only addressed "a portion" of the credit requirements for MRc1, 2 and 3 and need to address the full credit. I am confused.

1
Mon Nov 30, 2015, 7:44 pm

Inventory vs Plan

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Michelle Rosenberger  on 

This credit talks about a purchasing plan but uses an inventory in lieu in the documentation.

1
Mon Nov 30, 2015, 7:07 pm

How FINAL is the Appeal?

General forums
posted by  Mary Kay  on 

EAp2 was denied in our final design review. We are going to appeal this by addressing their comments and getting the energy savings above 10%. My question is, IF the appeal is denied, what then?

0

Existing Central Plant and New building

NC-2009 EAp2:Minimum Energy Performance
posted by  Mital Patel  on 

We have a new building but with existing central plant that serves also another building. My question is do i have to model part of existing central or whole.

1
Wed Jul 8, 2015, 2:32 pm

Green Cleaning in a Fab

NC-2009 IDc1:Innovation in Design
posted by  David Gibney  on 

I'm working on a semiconductor fab that is part of a LEED campus project. The campus has a well-established, campus-wide green cleaning program in place.

1
Fri Nov 27, 2015, 9:11 pm

No irrigation for pre-req

NC-v4 WEp1:Outdoor water use reduction
posted by  Robyn Dowsey  on 

I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true

1
Thu Aug 27, 2015, 8:37 pm

Mixed-use Building

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Wan Ji Loo  on 

Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.

1
Mon Nov 30, 2015, 10:34 pm