Forum quick links
Sixth grade level height
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Gustavo De las Heras Izquierdo on
The FGI Guideline Section 1.2-6.3c recommends to install signage at sixth grade level. Does anyone know what it means?
Dynamic Plaque for ID: Green Education
posted by Jennifer Preston on
Has any Project Team achieved the ID: Green Education credit with the LEED Dynamic Plaque satisfying requirement #1: "Comprehensive signage program built into the building's spaces to educate the
satisfaction surveys - Ergonomics strategy
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Jean-Baptiste SARFATI on
Are there standardized satisfaction surveys for ergonomics workstations in a store ? We would like to evaluate METWAs, furnishings, and accessories to ensure they continue to meet the diversity of
Confused about credit title
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
Is MRpc52: A) "Material multi-attribute assessment", as stated under credit language or B) "Environmentally preferable non-structural products and materials: perscriptive attributes"
Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Rack location
Healthcare-v2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Gustavo De las Heras Izquierdo on
Verbatim from the rating system: "Provide secure bicycle racks and/or storage within 200 yards of a building entrance" May we place half of the racks next to the staff's entrance and the other half
Natural Stone : Floor Score compliance required or not for ?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ammar Yahia on
We have a situation here, for the scope of finishes company's materials submittals. the query wither the compliance with Floor score or any stringent third party is applicable or not for Natural St
Can we administer survey on multiple days?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Helen Samuel on
I have a project that has operations 7 days a week. About 75% of workers come to the site Mon-Thu, and the other 25% of the workers come to the site Fri, Sat and Sun.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.