compliance with IS 7730:2005
NC-v4 EQc5:Thermal comfortposted by Angelina Ten on
Dear all, 1. Could you please tell me how did you get the values for radiant asymmetry of ceilings and walls, vertical air temp. difference and floor surface temperature for NC projects.
Option 1 - Reduction Combination?
NC-2009 WEc1:Water Efficient Landscapingposted by Cynthia Estrada on
We are looking at this credit for our project and after reading a few posts and reviewing the WEc1 form in LEED online my question is; the NC 2009 reference guide states that "Reductions must be at
Incomplete Space within LEED-CI Multi-Use Building
CI-2009 PIf1:Minimum Program Requirementsposted by Sara Zoumbaris on
Hello, We are working on a multi-use building that will house a hotel, residence, retail and a restaurant.
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
enhanced refrigeration management credit
NC-v4 EAc6:Enhanced refrigerant managementposted by david gordon on
can someone explain how/why a credit is achieved under the LEEDv4 , enhanced refrigerant management.
New Audit (outside performance period)
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Nate Gillette on
We received comments from USGBC and they have stated that we can do a new audit. Question: if we do a new audit, do we have to extend the performance period?
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified Woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.
Pending commissioning completion
NC-v4 EAp1:Fundamental commissioning and verificationposted by Charalampos Giannikopoulos on
Projects registered with LEED v3 had an option of indicating that commissioning report is pending completion and providing a contract to ensure that the report will be completed.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Certifying a single Building within a Complex - energy metering
EBOM-2009 EAc1:Optimize Energy Performanceposted by Peter Gibney on
I have a query with respect to our Building and an aceptable level of energy metering. The building under certification is one of several buildings however has common heating and cooling production