Forum quick links
Local Food Production
Pilot-Credits SSpc82:Local food productionposted by OSLEIDE WALKER on
Does anyone have any experience developing a successful Integrated Pest Management (IPM) Plan for this pilot credit. Do you know exactly what measures or components are required?
modeling VRF with DOAS
NC-2009 EAc1:Optimize Energy Performanceposted by Brian Thornton on
Is there an accepted protocol for modeling in eQuest VRF systems with DOAS that does not require an exceptional calculation for seeking credit for EAc1?
Application Guide for Campuses and Multiple Buildings
posted by Jeff Smitley on
Is there an Application Guide for Campuses and Multiple Buildings that can be used for LEED v4 BD+C: Schools?
Are windows on one side, at large hall, sufficient?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Anna Korinkova on
“Hello, I am working on IEQc8.2 (views) for large logistic center. The hall dimensions are 230x60 metres.
LEED Online V4 problems
NC-2009 IDc2:LEED Accredited Professionalposted by Susannah Goddard on
I am trying to claim this credit on the LEED Online v4 platform.
Mixed Use, Mid Rise Residential, CO2 in units?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Joanna Jenkins on
My firm has had success not including CO2 sensors in units of mid-rise residential project under LEED v3 NC.
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix
Annual Energy Cost
NC-2009 EAc2:On-Site Renewable Energyposted by Sarah Thompson on
I am trying to figure out which cost to put in here. Another post said it was savings, although I can't find anything under the credit intent or resources for this specific item.
Existing features
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Charalampos Giannikopoulos on
For an existing building undergoing major renovation how should the existing water fixtures be handled as far as WE prerequisite is concerned?
Cost Analysis?
Pilot-Credits PC60:Integrative Processposted by Crina Bosch on
Thinking about pursuing this credit as an innovation for a LEEDv2009 Schools project. I'm confused about the requirements, however.