Forum quick links
Can an existing tenant pursue LEED O+M?
posted by Joel Cesare on
A company that occupies an entire floor of an existing building has been in operation in this building over 2 years. They asked if they could get LEED Certification for their office.
Existing building renovation - unknown existing envelope
NC-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hi, To do the baseline model envelope I believe I should use the existing one (previous to any alteration).
Simulation software and Ashrae 90.1 version
CS-2009 EAc1:Optimize Energy Performanceposted by Antonio Márquez on
Hi, we are certifying a new C&S building, in v2009. The version of Ashrae 90.1 to follow is 2007?
Rubber Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by ethen mcmanus on
I'm working on a project that is classified as "New Construction" & not a "School Project" My LEED Reference guide for green building design & construction updated as of June 2010 states t
Changing out fixture trim after the performance period
EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Tom Kennedy on
We're in the middle of our response to the reviewer's comments on our initial submission (so our performance periods ended a few months ago). Let's say we decide now that we should change out some
Daily Occupancy for a cinema
Retail-CI-v2009 WEp1:Water use reductionposted by LEED Pro Consultant on
Im working on a CI Cinema Project , there are some areas like Fast Food Service, how can I determinate the occupancy for the persons that are going to the cinema, under Visitors or Customer Retail?
Daily Occupancy for Cinema
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by LEED Pro Consultant on
Im working on a CI Cinema Project , there are some areas like Fast Food Service, how can I determinate the occupancy for the persons that are going to the cinema, under Visitors or Customer Retail?
Confidential Projects Information Control
posted by Sara Goenner Curlee on
I am working on a v2009 NC project with a client very sensitive to the confidential nature of their work. The project is indicated as private/confidential through LEED Online.
Baseline Lighting Power for a Major Renovation
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
We are replacing the mechanical system, updating the plumbing system and insulating the building envelope for an existing office building.
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize Energy Performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?