Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Supplemental Guidance to the MPR for LEED v4
NC-v4 MPR1:Must be in a permanent location on existing landposted by SoYoung Lee on
It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.
Metal Flooring
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mike D on
Does metal flooring need to meet the requirements of Floorscore or can it be exempt from the credit requirements
All electric Residential Building
NC-2009 EAp2:Minimum Energy Performanceposted by Emmanuel Pauwels on
Hi, we are working on a residential project.
Greywater and wastewater reuse
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by CT G on
We have seen several comments regarding the possibility (or not) to achieve both WEp1 and WEc3 through the use of on-site greywater and wastewater.
Electric Charging Stations for LEED CI ID Credit
CI-2009 IDc1:Innovation in Designposted by Matthew Catterall on
We are in design on a LEED CI project and are contemplating installing electric charging stations.
Advanced Buildings™ Core Performance™ Guide for residential
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hi! Am I right that there is no prescriptive option available for residential multiunit buildings of more than 4 floors? I understand that the Advanced Buildings™ Core Performance™ Guide is not app
Which LEED Rating system?
posted by Stella Stella on
Hi, we are working on a project with integrated development, which houses a community park and a building with mixed use (commercial ,indoor & outdoor sports, library) in the same site.
Is APPENDIX Needed
NC-2009 IEQp1:Minimum IAQ Performanceposted by ABDUL MUTHALIB MOHAMED on
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi
If Purchasing Chilled Water from Campus Central Plant...
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Nelina Loiselle on
We have a project that we are modeling as purchased chilled water and steam because it is on a campus that includes a central plant. The campus sells the utilities to the department.