International Project not eligible for Energy Star Rating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Se Hyeung Pak on
Hi, I am involved in EBOM case located in Korea. I have a couple of Qustions based on the case. We needs to meet the requirements of LEED O&M Certification EA Pre-requisite Case2 option1.
energy used on-site vs sold energy
NC-v4 EAc5:Renewable energy productionposted by LEEDme Lorenzi on
I’m reading the new version of the reference guide and I have some doubts concerning this credit. As example, within the LEED boundary electricity is produced by pv panels.
gs 11 1993 test VS iso
Retail-CI-v2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Michele Comperti on
for a leed platinum project in Europe we must submit a wall paint wich has a certificate for voc content made under an iso 11890 test (product manufacturer is Akzo Nobel Italy factory, product Al
Ecocert
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Gabriel Frasson on
Anyone knows if LEED accept Ecocert Seal?
FEV/LEV and Carpool Signage
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Robin Dukelow on
We are pursuing SSc4.3 & SSc4.4.
SS c2 Building Exterior Cleaning
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Hadrian Vivek on
We have procured certain eco-friendly products for the exterior cleaning of our facades and windows.
5% path
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Andres Giraldo on
How can we set the form to achieve the 5% of the total site area as described in the reference guide. Because in LEED online, it's the 25% path set as default.
retail spaces in office building
CS-2009 IEQc2:Increased Ventilationposted by Anna Bak on
Hi, In our C&S project the investor provides AHUs to supply fresh air to offices.
Data Center Calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. However, There are some questions in relation
Absorptive Materials
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Omar Elrawy on
Dear all, I actually do know what is an absorptive material but only by logic/sense.