Forum quick links
ID point for Green Cleaning- need advice
NC-2009 IDc1:Innovation in Designposted by Tammy Dalton on
I am planning to pursue an ID point for Green Cleaning for a NC v2009 project.
salt free water softening / citrus based chelation
posted by adam lavender on
Hi all.
IAQ Flush out-using temporary exhaust systems
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Stella Stella on
Hi, We are proposing a IAQ flush out procedure for our facility which consist of a lot of FCU’s. Due to the FCU’s the flush out procedure is excessively long.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
energy costs
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Sometimes in the energy bills a part of the costs doesn't depend on the energy that is used (e.g.
LEED Spec-construction credits' responsibility on GC/CM
posted by Jody Boelhauf on
Has anyone had any luck on writing their LEED Specification in which the general contractor or construction manager is actually responsible for filling out the LEED Online credits? Our office uses
No VOC information
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Citlali Mora Bello on
Hello, We are working on a project that is trying to achieve this credit, but I've encountered two problems: 1. Some of the cut sheets do not specify the VOC test methodology. 2.
Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Bernie Hont on
I am modeling a shell office building project for LEED 2009 using ASHRAE 90.1-2007 as the basis for modeling.
Do three multifamily buildings qualify as multiple buildings?
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We have a project with three multifamily apartment buildings and each qualifies under the new-ish LEED for Homes Multifamily 2010 rating system.
Required Vegetated Area and LEED Boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.