Forum quick links
Storage for "Peak Visitors"
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan McEvoy on
We have several projects where storage for "peak visitors" may not be practical. Might LI #2422 apply in these cases? Or can anyone suggest a different compliance path?
plaque presentation
posted by Stella Stella on
Hi, We would like to know if USGBC will send representatives to present the plaque once a project is certified.Would USGBC will come down to the respective project loaction ,if the The project orga
Green Roof Plant overhang
NC-2009 SSc7.2:Heat Island Effect—Roofposted by John Covello on
Hello, We have larger planters set upon our project's roofs. The rest of the roof area will be covered in gravel. Much of the plant growth will droop and overhang onto the gravel.
Rainwater reuse for irrigation and flush discharges
NC-2009 WEc1:Water Efficient Landscapingposted by Ricardo Sá on
In case a given project is predicted to feed both the irrigation system and the flush discharges with harvested rainwater, which criteria shall be used to "divide" the rainwater contribution for ea
lansdcape water calculation montly/daily and rainwater
NC-2009 WEc1:Water Efficient Landscapingposted by ebru unver on
Hello, actually I have very basic question.
Occupation with shifts - Calculating peak occupancy
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by LEED Pro Consultant on
Hello all, We are working on a manufacturing facility with 3 shifts and I would like to know if the calculation has to be done with the highest volume shift + peak visitors (this seems more reason
Outdoor air monitoring through BMS
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by LEED Pro Consultant on
Hello all, We want to achieve this credit for a manufacturing facility.
LEED AP exam
posted by Ahmed Refaie on
I am going to take my LEED AP exam and I have a question about the exam questions. what are the missed 15 exam question?
Location of charging station outside the project boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anke Koch on
We work on phase 2 of a project in Berlin, Germany.
LEED site definition
CS-2009 PIf2:Project Summary Detailsposted by Jie Xiong on
Hi, I am doing an office tower which locates on a podium together with another tower. I just choose the total building site as the LEED site.