Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Concerning Carpet

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Omar Elrawy  on 

Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install

1
Thu Jul 3, 2014, 8:08 am

VLT x WFR calculation exceeds 0.18

EBOM-2009 IEQc2.4:Daylight and Views
posted by  Indoor Environmental Quality Team LEED Community Project  on 

I am reviewing Option 1 Path 2 (Prescriptive) for a visitor's center project. There are several private offices where the VLT x WFR value exceeds the 0.18 threshold.

1
Sat Jul 26, 2014, 5:55 am

Fundamental Commissioning vs Enhanced Commissioning

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Zeb Foss  on 

Hello, I am in Canada so we are sill required to use LEED CI 1.0, and I have a question regarding the responsibilities of the CxAs.

1
Sat Jul 26, 2014, 5:44 am

SS 7.1-4 LEED Online form issues?

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Wendy Parker, LEED AP  on 

Is anyone else having issues with filling in the Non-reflective parking spaces table in this form?

1
Mon Jan 26, 2015, 12:24 am

Factory Space Default value

CS-2009 IEQp1:Minimum IAQ Performance
posted by  John Covello  on 

Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space.

0

Residential grade dishwasher in breakroom

Retail-CI-v2009 WEc1:Water use reduction
posted by  Robin Dukelow  on 

The WEp1 language reads: ". . . and are not commercially rated MAY also be excluded.

1
Fri Jun 27, 2014, 3:54 pm

Fan power calculations

CS-2009 EAp2:Minimum Energy Performance
posted by  Eleni Soulti  on 

Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4

1
Mon Jun 30, 2014, 1:22 pm

NAF (GLUE) LETTER

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  jack larson  on 

I have a letter from the manufacturer stating that the laminating adhesive that will be used in the fabrication of the doors contains no added formaldehyde. (NAF).

1
Sun Jun 29, 2014, 5:42 pm

LEED v4 Required Standards list

General forums
posted by  Andres Schwarz  on 

Do you know where I can get a list of all the required standards in LEED v4 in a single unifed list? I am looking for the ones we most work with- i.e. ASHRAE 90.1, 62.1, etc.

0

Forniture in IEQc8.1 option 1

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  FABIO VIERO  on 

Dear all, I'm now working on a project (office building, new construction) under LEED NC v2009 Certification.

1
Mon Jun 30, 2014, 11:07 pm