Forum quick links
Is private museum an Active store + Transfer OA calculation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hello, I have an office project where client wants 2 floors for buddha statue exhibition and antique.
Floor Area for Flush Out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nikhilesh Srinivasan on
I'm looking for some help with the area to be used for a flush out calculation.
Thermal Comfort Survey
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Should I come up with my own thermal Comfort Survey in excel or word based on the information given in "Center for the Built Environment" and "The Usable Building Trust" websites or is there any s
Non-certifiable Parking Garage within LEED Boundary
posted by natalie tan on
We are seeking LEED certification for a new office building. A new separate parking garage building (under the same construction contract) falls within the LEED Boundary.
ecoscorecard vs. invoice
CI-2009 MRc7:Certified Woodposted by William Weaver on
In the past, whenever I have pursued MRc7, I have always provided invoices as supporting documentation.
Buildings with no water use
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LEED Pro Consultant on
Hello, I am working on a Campus project and some of the buildings do not require use of water because near buildings satisfy the occupants needs. My doubt is about the Leed Interpretation #10214.
deriving Species/Density/Microclimate Factors
NC-2009 WEc1:Water Efficient Landscapingposted by Kelsi Hurlbut on
Hello Again Everyone, Does anyone know how to calculate the Species Factor, Density Factor or Microclimate factor?
trying to understand the effort
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ramana Koti on
Hello. We're trying to decide if pursuing energy modeling under Option 2's Path 1 would be worth the effort.
Plf4 - upload L-4 & Plf4-3
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
What is specifically meant with " mechanical plans and / or drawings " for L-4 ? I think it is definitely floor plan layout but what about details ? Is the details sheet also needed ?
Submit For Review
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Does "submit For Review" tab under "Design Preliminary Review" ( LEED online - timeline ) allow me to review the credits that I am planning to submit one more time before I submit it OR does it