Forum quick links
5 degree deadband
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
How is ASHRAE 6.4.3.1.2 5 degree deadband interpreted? 70-75 deadband provides six temperatures in which the thermostat is "dead".
ACP for Europe regarding VOC limits and EMICODE classes?
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Francesco Allaix on
EBOM Alternative Compliance Path for Europe (2009) introduced the use of European methods (AgBB/DIBt GUT, EMICODE, Blue Angel) to verify the maximum VOC concentration in credit MR 3. Do you know if
We are working on a project
posted by May Xu on
We are working on a project consisting of several offices and residential buildings, but LEED boundary is considered only one of the office building.
AGMBC: Multiple Building and On-Campus Projects
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Tam Kin Hung on
Project brief: 1. The project is composed of 3 office buildings with retail podium for each of them, 1 residential building also with retail store surrounding it.
Precertification in LEED-CS v4
posted by Nándor Kovács on
Hello, Is there any information available about precertification process in LEED-CS v4?
Air Locks and Negative Pressure
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Raina Tilden on
The project I am working on consists of a huge machine shop on one side of a glass wall and offices on the other side of the glass wall.
Using BD+C SSc4.1 as an EBOM IO credit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Michael Smithing on
We're working on the EBOM certification of a building with excellent public transportation. Has anyone attempted to use SSc4.1 as an IO credit in EBOM?
Pilot Credit Closed
Pilot-Credits SSpc7:Light pollution reductionposted by Bill Swanson on
Pilot Credit Closed This pilot credit is closed to new registrations
Purchased Energy Rate
posted by May Xu on
We are working on a project consisting of several offices and residential buildings, but LEED boundary is considered only one of the office building.
greenhouse as a connection to the outdoor
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by FABIO VIERO on
We are assessing a two stories office building composed by three main office blocks, each one connected by two greenhouse blocks hosting plants and people as a break area (non regularly occupied ar