Forum quick links
LeedOnLine Forms Incorrect
CS-2009 EAp2:Minimum Energy Performanceposted by Thomas Newbold on
I am having a problem with LeedOnLine and USGBC hasn't been any help.
SEED evaluator tool
ND-v2009 NPDc12:Community outreach and involvementposted by USGBC Colorado on
Are you aware of project teams using the SEED (social, economic, environmental design) evaluator tool http://www.seednetwork.org/ as a strategy to achieve this credit?
Contractual Relationship
CI-2009 EAc2:Enhanced Commissioningposted by Brian Smith on
The owner is looking for CI-2009 Enhanced Cx on a project. The CxA was originally contracted through the GC as they were not a prequalified vendor of the Owner.
Documentation for upload
NC-2009 SSc1:Site Selectionposted by Olga Kozub on
I have a project in Russia. In Russia we use the local equivalent of the United States Code of Federal Regulations named State Immovable Property Cadastre.
Materials to be included
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Michael Haugeneder on
We are working on a project in Berlin.
Accessible Bus Stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Brett Beckemeyer on
Our project has several bus stops within the 1/4 mile radius, and what I would consider to be the most direct route along the street to the stops is also within 1/4 mile walking distance.
Rating System selection for an Existing Retail building
posted by Therese Malm on
We have a building which is an existing retail & manifacturing building. Which rating system is the most appropriate for seeking certification: EBOM or CI Retail?
Green roof deck
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by mariela garate on
Hi, We are willing to use an innovative type of green roof that's based on compacted plastic waste board and textile (1,3cms thickness + textile). This substrate replaces the need of soil.
Vacancy sensors in place of occupancy sensors
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Heather Dorer on
Can vacancy sensors be used in place of occupancy sensors in appropriate spaces? Vacancy sensors, like occupancy sensors, will turn the lights off when the room is deemed vacant.
Is flush out possible in countries with high humidity?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Katherine Ann Resurreccion on
Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?