I am also an independent LEED

General forums
posted by  Brad Miller  on 

I am also an independent LEED consultant that is considering having to change my membership from regular to Silver because I have some large projects coming up that will have a substantial noticeab

0

Irrigation System

LEED Canada Forum
posted by  Lilian Seow  on 

Is irrigation system considered as a division 15-mechanical ? Our project spec places this system in division 2-landscape. This will impact the material-cost calculation for MR credit.

1
Tue Sep 17, 2013, 7:31 pm

Multiple small split systems - Can they ever work?

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Robert Wichert  on 

I have about sixty-five split systems in two apartment buildings using R-410a. The factor that is keeping me from meeting this credit's requirements seems to be Rc (lb/ton).

1
Wed Aug 7, 2013, 1:54 pm

simulation program for natural ventilation

NC-2009 IEQc2:Increased Ventilation
posted by  Adam Targowski  on 

Is there any list of programs which can be used to demonstrate compliance with IEQ Cre 2 Option 2. Do you know if DesignBuilder can be used to show appropriate airflow rates?

1
Tue Aug 13, 2013, 6:01 pm

Open office - do I count the inner offices & meeting rooms?

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Stantec BG+LU FW  on 

I am doing the calculations for the "daylight factor method" for Daylight and Views credit. It is an office floorplate that is roughly 150'x150' with an inner core.

1
Wed Aug 7, 2013, 7:10 pm

Native and Adapted Plants

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Charlotte Page  on 

Hello everyone, New to LEED, and I have been trying to figure out who determines what is native and what is adaptive? Need to put a list together for the project that I am working on.

1
Wed Aug 7, 2013, 8:56 pm

Lighting load synergy in EAp2 and EAc1.2

CI-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?

1
Thu Aug 8, 2013, 2:58 pm

Lighting Load synergy EAp2 and EAc1.2

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Saju Varghese  on 

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?

1
Thu Aug 29, 2013, 2:36 pm

beginner question about site area to be treated

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Patricia Weber  on 

hi there, here's what will probably be an easy question for you but is stumping me, as this is my first time documenting this credit.

1
Thu Aug 8, 2013, 11:57 am

Differential Pressure Test

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Michael Smithing  on 

We've conducted the differential pressure test and the average is around 7 pa. We've had the contractor test the room and report the results on the LEEDUser form.

1
Tue Nov 5, 2013, 3:29 am