Forum quick links
I am also an independent LEED
posted by Brad Miller on
I am also an independent LEED consultant that is considering having to change my membership from regular to Silver because I have some large projects coming up that will have a substantial noticeab
Irrigation System
posted by Lilian Seow on
Is irrigation system considered as a division 15-mechanical ? Our project spec places this system in division 2-landscape. This will impact the material-cost calculation for MR credit.
Multiple small split systems - Can they ever work?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Robert Wichert on
I have about sixty-five split systems in two apartment buildings using R-410a. The factor that is keeping me from meeting this credit's requirements seems to be Rc (lb/ton).
simulation program for natural ventilation
NC-2009 IEQc2:Increased Ventilationposted by Adam Targowski on
Is there any list of programs which can be used to demonstrate compliance with IEQ Cre 2 Option 2. Do you know if DesignBuilder can be used to show appropriate airflow rates?
Open office - do I count the inner offices & meeting rooms?
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Stantec BG+LU FW on
I am doing the calculations for the "daylight factor method" for Daylight and Views credit. It is an office floorplate that is roughly 150'x150' with an inner core.
Native and Adapted Plants
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Charlotte Page on
Hello everyone, New to LEED, and I have been trying to figure out who determines what is native and what is adaptive? Need to put a list together for the project that I am working on.
Lighting load synergy in EAp2 and EAc1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?
Lighting Load synergy EAp2 and EAc1.2
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?
beginner question about site area to be treated
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Patricia Weber on
hi there, here's what will probably be an easy question for you but is stumping me, as this is my first time documenting this credit.
Differential Pressure Test
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Michael Smithing on
We've conducted the differential pressure test and the average is around 7 pa. We've had the contractor test the room and report the results on the LEEDUser form.