Forum quick links
Electricity Monitoring
Pilot-Credits PC38:Advanced Utility Trackingposted by Angela Loughry on
Would the intent of the credit be satisfied if only electric end uses were monitored - say plug loads, lighting loads, mechanical loads, and one appliance to get our four loads.
Manufacturer information on SRI not available
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Magda Aghababyan on
I was looking for manufacturer data sheets to confirm the SRI for Zn-Al coated roofing (Silver color) but in Sri Lanka the suppliers do not have that information available. Can you please tell me
Mixed strategy, windows and mechanical ventilation?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Lise Dannesboe on
If I understand the intent of the credit correctly, we have to provide individual controls for every second FTE in individual spaces or open-plan offices.
Scheduled pest management not a good strategy?
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Magda Aghababyan on
Is scheduled pest management activities (for example once a month) not an appropriate strategy under this credit?
System narrative
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by ESD Singapore on
Hi all, I am currently working on a retail mall that starts operating from 10am to 10pm.
Vacancy Sensor
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Would Vacancy sensors comply with the occupancy sensor requirement for classrooms, breakrooms and conference rooms under Ashrae 90.1-2007?
LEED ID+C for a complex Owner/Tenant scenario (Office Space)
NC-2009 PIf3:Occupant and Usage Dataposted by Lida Lewis on
I am starting to fill out the paperwork for a new LEED ID+C project for which my LEED Project Boundary will be the full floor of an office building.
"Borrowed Light Simulation" for LEED design review
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by charles bell on
We received a comment on interior spaces that are using "borrowed light" from interior glass doors, sidelights and transoms.
Heat Pipe Refrigerant
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Saju Varghese on
Does heat pipe refrigerant need to be accounted for this credit? Thanks
Heated pool covers
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
I’m currently working on a LEED certification of a public natatorium that has three swimming pool tanks.