Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Reflectance values

Pilot-Credits EQpc22:Interior lighting - quality
posted by  Jennifer Preston  on 

If all of our surfaces meet the minimum thresholds for reflectance - as documented by manufacturer-provided cut sheets - do we need to include calculations for a weighted average of surface reflect

1
Wed Jul 10, 2013, 8:19 pm

Durable Goods Lease Contracts

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Taygun Yüksel  on 

In one of the chain company, it only exits leasing contract both with computers and printers/ scanner equipment. Contracts cover fixing and change by their services.

1
Mon Jul 15, 2013, 3:05 am

LEED EBOM Facilities Alterations and Additions

LEED Rating System Selection
posted by  Peter Gibney  on 

We are analyzing an existing building and determining the rating system to follow.

1
Thu Jul 25, 2013, 5:07 pm

IEQc4.1 and IEQc4.3 and silica sand in sanded grout

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Jill DeMarotta  on 

Has anyone found a sanded grout that doen't have silica sand in it? It seems like our only option is to go with an unsanded grout or something more expensive....

0

Tenant Area HVAC System

CS-2009 EAc1:Optimize Energy Performance
posted by  Nidhi Khanna  on 

Hi, I am working on a mixed use project with retail on 1st floor and office on 2nd and 3rd floor with a total project area of 115,000 sf.

1
Thu Jul 11, 2013, 2:54 pm

Everything is an assembly.

CI-2009 MRc5:Regional Materials
posted by  Valerie Molinski  on 

I recently got a review back that said that every material I am using to demonstrate compliance for Mrc5 is an assembly and "therefore, the individual components must be separated by weight." Sinc

1
Thu Jul 11, 2013, 8:18 pm

Forklifts as Individual Workstations

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Craig Wilson  on 

I am working on certifying a warehouse, and would like to consider the forklifts as individual workstations, as the warehouse employees are each assigned one (in lieu of a desk) and allowed to pers

1
Wed Jul 31, 2013, 3:44 pm

Vehicle tracking control dirt road

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Juan Robles  on 

We are working on a project in Costa Rica where the access road is a dirt road.

1
Fri Jul 12, 2013, 3:04 pm

Full Height Glazing

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Lauren Bellamy  on 

Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height o

0

Technical Manual for new Green Globes for New Construction

General forums
posted by  Charles Kibert  on 

As some of you know the Green Building Initiative is releasing the new version of Green Globes for New Construction which is based on ANSI/GBI 01-2010," Green Building Assessment Protocol for Comme

1
Thu Jul 11, 2013, 11:58 pm